Data Center Construction Site Manager
Company: OVHcloud
Location: Warrenton
Posted on: March 4, 2026
|
|
|
Job Description:
Job Description Job Description Job Summary The Data Center
Construction Site Manager manages the engineering, design and
construction of new production facilities, or the modification of
existing facilities. Anticipates, plans, and coordinates the
ongoing and future construction requirements for our data center
located in Vint Hill, VA. Responsible for preparing and managing
technical, logistical, and safety requirements during
pre-construction and construction phases. Base pay range: $125,000
- $135,000 (based on relevant experience). Essential Duties &
Responsibilities - Lead the bid, vendor evaluation and selection,
and contract negotiation processes. - Obtain permits and arranges
for inspections. - Responsible for developing and adhering to the
construction schedule and budget. - Monitor construction activities
for compliance with internal specifications and external standards
and/or regulations. - Coordinate the work of
contractors/subcontractors during renovation or construction of
facilities. - Lead the development of scheme design by defining
options for construction mode and methodology. - Coordinate with
local third-party vendors, in collaboration with the PM Design &
Commissioning, on the development of general schematics and layouts
for electrical distribution, cooling distribution, network
structured cabling, and fit-out. - Collaborate with PM Design &
Commissioning to define the procurement strategy and implement
tender processes with the support of the procurement department. -
Provide daily, weekly, and monthly status reports for each phase of
construction. - Responsible for the daily management of vendors,
adherence to OVHcloud quality requirements, and compliance with
federal, state, and local health and safety regulations. -
Supervise, optimize, and manage material/equipment site reception
and storage. - Ensure any site design amendments are completed
accordingly. - Responsible for construction site project quality
control and ensuring any technical non-conformities are properly
resolved. Minimum Requirements - 8 years of experience in
construction site management. - Electrical certification(s)
preferred. - Bachelor’s degree in engineering or a related field or
equivalent applicable experience. - Multi-technical construction
site experience is required. - Expertise in one or more of the
following areas: structural, mechanical, cooling, electrical, or
BMS. - Ability to collaborate effectively in a team environment. -
Excellent communication and organization skills are required, with
strong attention to detail. - Ability to identify key internal and
external stakeholders, coordinate project plans, and drive
successful completion of construction requirements. Working
Conditions While performing the duties of this job, the employee is
frequently required to handle; reach with hands and arms; stoop,
kneel, bend, crouch, or crawl. The employee must occasionally lift
and/or move up to 50 pounds or more. Hands-on interaction with
mechanical and electrical equipment is required, where safety
guidelines must be strictly adhered to while working with such
equipment. Company Description – About OVHcloud OVHcloud US is a
subsidiary of OVHcloud, a global cloud provider that specializes in
delivering industry-leading performance and cost-effective
solutions to better manage, secure, and scale data. OVHcloud US
delivers bare metal servers, hosted private cloud, hybrid and
public cloud solutions. OVHcloud manages 43 data centers across 12
sites on four continents, manufacturing its own servers, building
its own data centers and deploying its own fiber-optic global
network to achieve maximum efficiency. Through the OVHcloud spirit
of challenging the status quo, the company brings freedom, security
and innovation to solve data challenges – today and tomorrow. With
a 25-year heritage, OVHcloud is committed to developing responsible
technology and strives to be the driving force behind the next
cloud evolution. https://us.ovhcloud.com. EEO Statement OVHcloud is
committed to providing equal employment opportunities to all
employees and applicants without regard to race, ethnicity,
religion, color, sex (including childbirth, breast feeding, and
related medical conditions), gender identity or expression, sexual
orientation, national origin, ancestry, citizenship status, uniform
service member and veteran status, marital status, pregnancy, age,
protected medical condition, genetic information, disability, or
any other protected status in accordance with all applicable
federal, state and local laws. Powered by JazzHR
PIdbbd11d5c8c6-25405-37958671
Keywords: OVHcloud, Towson , Data Center Construction Site Manager, Engineering , Warrenton, Maryland